How to Make a Raised Pool Step by Step
How to do An Elevated Construction Pool Step by Step:
The design and construction of an above-ground pool can be a challenging project for those looking to add a special touch to their home. This option, which offers numerous advantages in terms of aesthetics and durability, requires a meticulous and technical approach to ensure a successful result. In this article, we will guide you through the essential steps to build your own elevated pool, thus providing you with the necessary knowledge to carry out this project efficiently and without setbacks.
1. Materials needed to build an elevated pool
1. Structural materials: Before beginning the construction of an above-ground pool, it is important to have the appropriate structural materials. These include reinforced concrete, reinforcing steel, concrete blocks and quality mortar. The reinforced concrete will provide the solid base necessary to resist the pressure of the water, while the reinforcing steel will guarantee the strength and stability of the structure. The concrete blocks will be used to raise the walls of the pool and the quality mortar will ensure a solid and long-lasting bond.
2. Coating and finishes: Once the structure of the pool is finished, it is time to think about the coating and finishes. For the coating, the most common options are tile, ceramic or paint specific for pools. These materials will provide a resistant, waterproof and aesthetic surface. In addition to the coating, other finishes should also be considered, such as access stairs, curbs and water filtration and purification systems.
3. Equipment and accessories: We cannot forget the elements necessary for the correct operation and enjoyment of the pool. This includes the installation of an efficient filtration system, water pumps, underwater lights, skimmers and drains. In addition, it is also important to consider additional equipment, such as outside stairs, showers, covers and heating systems. These elements will guarantee the comfort and safety of those who enjoy the pool, as well as its easy maintenance.
In summary, the construction of an elevated pool requires various structural materials, such as reinforced concrete, reinforcing steel, concrete blocks and quality mortar. In addition, it is essential to consider the coating and finishes, such as tile, ceramic or specific paint for pools. Likewise, we cannot forget the necessary equipment and accessories, such asfiltration systems, underwater lights, ladders and covers, which will guarantee the correct functioning and enjoyment of the pool.
2. Preparation of the land and foundation for the above-ground pool
Preparation of the land
Before starting the construction of an elevated pool, it is essential to carry out adequate preparation of the ground. The first step is to study in detail the place where the pool will be installed, taking into account factors such as the terrain, climatic conditions and local regulations. It is important to level the ground to ensure a stable and uniform base.. To do this, heavy machinery such as excavators and graders can be used.
Once the ground has been leveled, it is necessary excavate the space for the pool. The depth and dimensions of the excavation will depend on the design and size of the pool. The space needed for the foundation structure and the filtration system must be taken into account. Besides, You must ensure that the ground is free of stones, roots or any object that could damage the structure of the pool..
Foundation of the elevated pool
Once the excavation is completed, the foundation for the elevated pool is constructed. The foundation is the base that provides stability and resistance to the structure. To do this, materials such as reinforced concrete and steel are used to guarantee a solid and durable base. It is recommended that you consult a structural engineer to determine the quantity and type of materials needed, as well as appropriate construction methods..
The foundation process includes the placement of formwork to contain the concrete and shape the foundation. Once the formwork has been placed, the concrete is poured and setting takes place. It is important to wait the necessary time for the foundation to acquire adequate strength before continuing with the construction of the pool.. The manufacturer's recommendations must be followed and curing times respected to achieve optimal results.
3. Construction of the walls and fastening of the pool structure
In this post, we will teach you how to build the walls and fasten the structure of a elevated poolStep by Step. The construction of the walls is a crucial step in the process of creating a pool, as it provides the necessary structure and stability for the water.
1. Preparation of the land: Before starting the construction of the walls, it is important to properly prepare the ground. This includes leveling the ground and removing any obstacles that may interfere with construction. Additionally, it is essential to ensure that the ground is completely solid and compacted to avoid future subsidence problems.
2. Placement of the bases and walls: Once the land is prepared, we can proceed to place the bases and walls. To do this, strong and durable materials will be used, such as concrete blocks. It is important to ensure that the bases are level and perfectly aligned, as this will guarantee the stability and resistance of the structure of the building. pool.
3. Fastening the structure: Once the walls are built, it is necessary to secure the pool structure. safe way. This is can achieve using steel and cement reinforcements, which will be inserted into the walls to provide greater resistance and stability. It is essential to follow the manufacturer's instructions regarding the placement of reinforcements, as this will ensure that the pool is safe and long-lasting.
With these steps, you will be able to build the walls and support the structure of your above-ground pool. effectively. Remember to always follow safety instructions and enlist the help of professionals if necessary. You will soon be enjoying your own pool at home!
4. Waterproofing and coating of the elevated pool
Waterproofing of the construction pool
Waterproofing is a crucial step in building a elevated construction pool. To ensure durability and prevent leaks, a series of steps must be carefully followed. First, it is necessary to properly clean and prepare the surface of the pool, removing any debris and ensuring a smooth and solid base. Then, you should apply a waterproofing sealant of high quality, making sure to cover the entire surface and follow the manufacturer's instructions for proper drying.
Once the sealant is dry, it is recommended to apply a waterproofing membrane over the entire surface of the pool. This membrane can be made of different materials such as PVC, EPDM or polyurethane. When choosing the right material, it is important to consider durability, flexibility and resistance to UV exposure to ensure efficient protection.
Construction pool coating
After waterproofing the above-ground pool, it's time to consider the coating. There are different options to cover a built-in pool, such as mosaics, ceramics or special paint for pools. The choice of coating will depend on personal style and preferences, as well as the available budget.
Mosaics are a popular choice due to their durability and aesthetics. They can be found in a wide range of colors and designs, allowing you to personalize your above-ground pool. On the other hand, ceramic is also a durable and stain-resistant option, ideal for those looking for a more minimalist look. Finally, special pool paint is a more alternative. economical, although it may require periodic repainting to maintain its proper appearance and protection.
In short, waterproofing and coating are essential stages in the construction of a elevated construction pool. By properly following these steps and choosing the appropriate materials, you guarantee a long-lasting pool, protected against leaks and with the desired style. Remember to always consult specialized professionals to achieve the best results.
5. Installation of the filtration system and water recirculation
: Once you have completed the construction of your above ground pool, it is essential to have an efficient water filtration and recirculation system. This will ensure that the water remains clean and crystal clear at all times. Before beginning with the installation, it is important to identify the most suitable place to locate the system components, such as the water pump, filter and disinfection system. Generally, it is recommended to place them in an area close to the pool, but out of sight so as not to affect the aesthetics of your outdoor space.
First step: selection of the system components: For an efficient filtration and recirculation system, you must carefully choose the components that suit your needs and the size of your pool. The water pump must have sufficient capacity to be able to filter the entire volume of water in an adequate period of time. The filter must be able to retain impurities and keep the water clear. Additionally, consider the option of using a disinfection system, such as a saline chlorinator, which will keep the water free of bacteria and algae.
Second step: installation of the components: Once you have selected the system components, it is time to proceed with the installation. Start by installing the water pump in the designated location, connecting it to the electrical supply, and making sure it is properly sealed to prevent water leaks. Next, install the filter in line with the pump, making sure it is properly connected and sealed. Finally, if you decide to use a disinfection system, follow the manufacturer's instructions for installation. Remember to check and tighten all connections to prevent water leaks and ensure that the entire system is properly sealed.
6. The process of filling and leveling the above-ground pool
Filling and leveling an elevated pool is a crucial step in the construction of this type of pool. It is important to follow certain steps to ensure adequate filling and a perfect level. Below are the steps to follow:
1. Preparation of the pool area: Before beginning the filling, it is important to prepare the area where the pool will be built. This includes cleaning and leveling the land, eliminating any obstacles or irregularities that may affect the filling and leveling process. The connections necessary for water filling must also be made, such as the installation of pipes and valves.
2. Filling the pool: Once the area is ready, you can begin filling the pool. This Can be done using a garden hose or a tanker truck, depending on the availability of water and the needs of each project. It is important to ensure that the water level increases evenly throughout the pool, thus avoiding possible unevenness that may affect its operation.
3. Pool leveling: Once the pool is full, it needs to be leveled properly. This is achieved by using a water level and adjusting the height of the pool legs or supports if necessary. It is important to ensure that the pool is completely level in all directions, to avoid future problems such as leaks or sliding of the structure.
By following these steps, an adequate filling and leveling process for an elevated pool will be achieved. It is essential to pay attention to details and ensure that all steps are carried out correctly, to ensure the proper functioning and durability of the pool.
7. Maintenance and care to take into account to ensure the durability of the pool and water quality
Once you have built your above-ground pool, it is important to follow certain care and maintenance to ensure durability and water quality. These measures will allow your pool to remain in optimal condition and provide you with a space to enjoy for many years.
First of all, it is crucial perform correct water filtration. This implies having an efficient filtration system that is capable of eliminating impurities present in the pool water. An adequate chemical balance must also be maintained, controlling the chlorine, pH and alkalinity levels of the water. This will prevent the proliferation of bacteria and algae, ensuring correct water quality.
Another fundamental aspect is the pool liner maintenance. Regular cleaning is recommended. of the walls and the bottom, using specific products and appropriate brushes to avoid damaging the surface. It is also important to regularly inspect the coating in search of cracks or detachments, since these must be repaired quickly to avoid major damage. In addition, they should be reviewed and maintained in good condition pool elements, such as skimmers, return nozzles and drains.
You may also be interested in this related content:
- What is the name of the dwarf in the Lord of the Rings?
- How to create an alias in Outlook step by step
- How to open MBOX